ELV & SecurityDelivered 2020

Al Jeel Tower

Abu Dhabi, UAE/Towers & Real Estate

A full ELV and ICT installation package across a 168-apartment residential and retail tower — 432 cameras, 2,391 data outlets, 95 controlled doors and close to 2,500 fiber splices, delivered as specialist subcontractor to the main systems integrator.

Al Jeel Tower, Abu Dhabi — the residential and retail development IP Care delivered ELV and ICT systems for

Al Jeel Tower, Abu Dhabi

Project
Al Jeel Tower
Sector
Residential & Retail Tower
Location
Abu Dhabi, UAE
Delivered
2020
Role
ELV & ICT subcontractor to the main systems integrator
By the numbers

The scale of the delivery

432
CCTV cameras
326 indoor, 106 outdoor
2,391
Cat6A outlets
Dual point, Fluke tested
2,464
Fiber splices
2, 8 and 16-core single-mode
95
Controlled doors
67 single, 28 double
82
Racks installed
12U to 42U
168
Apartments
Plus retail and GSM rooms
The Challenge

A live residential tower build with 168 apartments, retail units and GSM rooms — every flat, riser and equipment room needing cabling, fiber, cameras and door hardware installed to programme without holding up the main contractor.

The Approach

In-apartment Cat6A and RG6 cabling, a single-mode fiber backbone from apartment ONUs through FTR to MTR, 432-camera CCTV, 95-door access control and 82 racks across every equipment room.

The Outcome

Every link Fluke-tested, every fiber core spliced and tested, and every rack labeled to standard — an ELV package the main contractor could hand over without rework.

On site with our team

Real delivery, real engineers

The work at Al Jeel Tower, discipline by discipline — every system specified, installed, tested and commissioned on the ground by one accountable IP Care team.

Scope 01 / 05

CCTV Systems

Four hundred and thirty-two cameras positioned, mounted and aligned across apartments levels, podium, parking and external approaches — each on a dedicated Cat6A run pulled, terminated and Fluke-tested before the camera went up.

  • 326 indoor cameras fixed and aligned
  • 106 outdoor cameras fixed and aligned
  • 432 dedicated Cat6A camera runs, terminated and Fluke-tested
  • 13 racks built out with CCTV equipment and terminations (10 × 27U, 3 × 42U)
  • 20 six-core fiber pulls from security IDF locations to the CCTV main rack
Scope 02 / 05

In-Apartment Cabling

Every one of 168 apartments cabled from the ONU to the faceplate — dual-point Cat6A for data and RG6 for television, terminated at both ends, patched into the floor rack and Fluke-certified flat by flat.

  • 2,391 Cat6A dual-point outlets pulled, terminated and Fluke-tested
  • 536 RG6 television points from ONU to faceplate
  • Patch panel installation and termination at every floor rack
  • 168 apartments plus retail units completed
Scope 03 / 05

Fiber Backbone & Splicing

The tower runs on single-mode fiber from each apartment ONU up through the floor rooms to the main telecom room. Close to 2,500 cores were spliced and tested — 2-core to the flats, 8- and 16-core on the risers and GSM links.

  • 336 splices on 2-core apartment ONU to FTR links, 168 pulls
  • 768 splices on 16-core FTR distribution, 48 pulls to MTR
  • 768 splices on 16-core terminations inside the main telecom room
  • 192 splices on 8-core GSM connectivity, GSM room and MTR sides
  • 100 splices on 8-core retail ONU links to FTR and MTR
  • 300 splices on 6-core security and ELV equipment room links
  • Patch panel and drawer installation included throughout
Scope 04 / 05

Access Control

Ninety-five doors cabled and commissioned end to end — door contact, magnetic lock, push button, break glass and card reader on every leaf — with 61 access control panels and their power supplies installed in the telephone rooms.

  • 67 single-door sets: door contact, maglock, push button, break glass, card reader
  • 28 double-door sets: 2 × door contact and maglock, plus push button, break glass, card reader
  • 61 access control panels and 61 power supplies installed in telephone rooms
  • 1 × 27U rack built out in the main ELV room with access control equipment
  • Cable pulling, installation, termination and testing on every device
Scope 05 / 05

Racks & Equipment Rooms

Eighty-two racks installed and dressed across floor telecom rooms, GSM rooms, retail units, the main telecom room and the ELV room — each one built out with its equipment, patched, labeled and left ready for handover.

  • 49 × 12U racks in floor telecom rooms (FTR)
  • 8 × 42U racks in the main telecom room
  • 6 × 12U GSM racks and 5 × 15U racks in retail units
  • 13 × CCTV racks (10 × 27U, 3 × 42U) and 1 × 27U ELV rack
  • Equipment mounting, termination and labeling to standard throughout
Scope schedule

The work, item by item

The installation scope delivered at Al Jeel Tower, discipline by discipline. Equipment was supplied by the main contractor; every quantity below is work carried out, terminated and tested by IP Care.

CCTV

CCTV installation scope delivered at Al Jeel Tower
Work itemQty
Cat6A pulling, termination and Fluke testing for cameras432
Indoor camera fixing326
Outdoor camera fixing106
27U rack installation with CCTV equipment and termination10
42U rack installation with CCTV equipment and termination3
6-core fiber pulling, security IDF to CCTV main rack20
6-core fiber splicing and testing, incl. patch panel drawer240

Access Control

Access Control installation scope delivered at Al Jeel Tower
Work itemQty
Single-door ACP set — cable, install, terminate, test67
Double-door ACP set — cable, install, terminate, test28
ACP panel installation in telephone rooms (incl. power supply)61
6-core fiber pulling, IDF rack to ELV equipment room5
6-core fiber splicing and testing, incl. patch panel drawer60
27U rack installation in main ELV room with ACS equipment1

In-Apartment Cabling

In-Apartment Cabling installation scope delivered at Al Jeel Tower
Work itemQty
Cat6A dual-point pulling, termination and Fluke testing2,391
RG6 TV cable pulling and termination, ONU to faceplate536

Fiber Backbone

Fiber Backbone installation scope delivered at Al Jeel Tower
Work itemQty
2-core pulling, apartment ONU to FTR (168 flats)168
2-core splicing and testing, apartment ONU to FTR336
16-core pulling, FTR to MTR48
16-core splicing and testing from FTR768
16-core splicing and testing inside MTR768
8-core pulling, GSM to MTR12
8-core splicing and testing, GSM room side96
Splicing and testing for GSM connectivity, MTR side96
16-core pulling, retail ONU to FTR (8 cores terminated)5
8-core splicing and testing, retail ONU to FTR50
8-core splicing and testing, retail ONU FTR to MTR50

Racks

Racks installation scope delivered at Al Jeel Tower
Work itemQty
12U rack installation in floor telecom rooms (FTR)49
42U rack installation8
12U rack installation (GSM rooms)6
15U rack installation in retail shops5
At handover

Finished means documented

Fluke tested throughout

Every Cat6A link — 2,391 in the apartments and 432 on cameras — pulled, terminated and Fluke-tested as part of the installation scope.

Fiber spliced and tested

Close to 2,500 single-mode cores spliced and tested from apartment ONUs through floor rooms to the main telecom room, patch panels and drawers included.

Labeled to standard

Racks, panels, outlets and fiber cores labeled to the project standard, with all installation accessories and tooling supplied by IP Care.

Delivered to programme

Work staged with the main contractor across cabling, installation, termination, testing and final snagging so the ELV package never held up handover.

Planning a similar project?

Talk to the team that delivered Al Jeel Tower. One accountable partner for ELV, security, cabling and network infrastructure across the UAE and GCC.

Back to Portfolio
Call UsChat with us on WhatsAppAl Jeel Tower Case Study — ELV & Security | IP Care